- Parking expansion (existing lots are full)
- Garage technical requirements (can only be built on large lot)
- Greenwood Avenue bridge replacement (as-is replacement, but pedestrian
connection down to new platforms possible)
- Station vehicular access (several configurations possible)
- Historic assets (no impact proposed)
- Neighborhood impact (visual and traffic)
|
|
10
|
|
|
11
|
|
|
12
|
|
|
13
|
|
|
14
|
- 2025 Previous Assessment
- Jenkintown-Wyncote = 898
- 2030 Updated Assessment
- Jenkintown-Wyncote = 811
|
|
15
|
- 73% of Jenkintown-Wyncote parkers come from Abington, Cheltenham and
Jenkintown
|
|
16
|
- Discussed at June Workshop
- Approximately 900 spaces
- 3 Supported levels
- 34’ or 3 stories
- Approximately 240 cars / level
- SEPTA ticketing, information, and waiting area within proposed garage
- First floor of garage same elevation as high level platform with direct
access
- 2.1 acres open space
- Modified Based on Input
- Approximately 700 spaces
- 2 Supported levels
- 24’ or 2 stories
- Approximately 260 cars / typical level
- SEPTA ticketing, information, and waiting area within proposed garage
- First floor of garage same elevation as high level platform with direct
access
- 2.1 acres open space
|
|