Jenkintown-Wyncote Parking Garage Feasibility Study
2
PROJECT PARTNERS
3
CONSULTANT TEAM
4
PROJECT SCOPE
5
WORK PLAN   (PHASE 1)
6
WORK PLAN  (PHASE 2)
7
SCHEDULE
8
EXISTING CONDITIONS
9
PLANNING ISSUES
  • Parking expansion (existing lots are full)
  • Garage technical requirements (can only be built on large lot)
  • Greenwood Avenue bridge replacement (as-is replacement, but pedestrian connection down to new platforms possible)
  • Station vehicular access (several configurations possible)
  • Historic assets (no impact proposed)
  • Neighborhood impact (visual and traffic)
10
 
11
 
12
 
13
 
14
PARKING DEMAND SUMMARY
  • 2025 Previous Assessment
  • Jenkintown-Wyncote = 898
  • 2030 Updated Assessment
  • Jenkintown-Wyncote = 811
15
RIDERSHIP ANALYSIS
  • 73% of Jenkintown-Wyncote parkers come from Abington, Cheltenham and Jenkintown


16
GARAGE PROGRAM
  • Discussed at June Workshop
  • Approximately 900 spaces
  • 3 Supported levels
  • 34’ or 3 stories
  • Approximately 240 cars / level
  • SEPTA ticketing, information, and waiting area within proposed garage
  • First floor of garage same elevation as high level platform with direct access
  • 2.1 acres open space
  • Modified Based on Input
  • Approximately 700 spaces
  • 2 Supported levels
  • 24’ or 2 stories
  • Approximately 260 cars / typical level
  • SEPTA ticketing, information, and waiting area within proposed garage
  • First floor of garage same elevation as high level platform with direct access
  • 2.1 acres open space
17
GARAGE CONFIGURATION
18
DESIGN ALTERNATIVES
19
SITE PLAN: ALTERNATIVE 1
20
SITE PLAN: ALTERNATIVE 2
21
SITE PLAN: ALTERNATIVE 3
22
GARAGE FACADES
23
STATION AREA
24
PEDESTRIAN ACCESS
25
Next Steps